11Physical Description(1) PanelLED PanelPower LED1000/100/10Mbps LEDLink/Activity LEDPOWERSpeedLNK/ACT12345RJ45 ConnectorsPower Connector5-Port Gigabi
(2) LEDTable 1-1 LED descriptionPower is suppliedNo powerLED Color Status DescriptionPWR(Power)GreenLitOffA valid link is establishedNo link is establ
22Installation1. Operating EnvironmentThis switching hub must be installed and operated within the limits of specified operating temperature (32-1310F
33Trouble-shooting1. Power LED is not lit z Check if the power cord is properly connected to the external power adapter and the power outlet. Make
Comments to this Manuals